New Zealand Aviation

Aotearoa Limited

  • New Zealand Aviation Aotearoa Ltd

  • About us

  • Become a Pilot

    • Commercial Pilots Licence
    • C - CAT Instruction
    • Flight Training
    • Gallery
    • Gallery 2
  • International Student Fees

  • Accommodation and Pastoral Care

    • Accommodation
  • Fleet and Instructors

  • Additional Courses and Opportunities

    • Forms
  • Forum

  • Members

  • Plans & Pricing

  • More

    Use tab to navigate through the menu items.
    To see this working, head to your live site.
    • All Posts
    • My Posts
    jiexiuwan
    Jul 19, 2021

    10 Ton Overhead Crane Installation in Ethiopia Pipe-Making Plant

    in General Discussions

    10 ton overhead crane for sale to Ethiopia. overhead crane installation service for our Ethiopia customer. 6 sets 10 ton Double Girder Overhead Crane installation in Ethiopia pipe-making plant. Learn 10 ton overhead crane specification and transaction process to get the crane information that you need.

    10 Ton Overhead Crane Specification

    • Lifting capacity: 10 Ton

    • Lifting height: 9 meters

    • Span: 24 meters,

    • Voltage: 380V, 50Hz, 3P,

    Overhead Crane Project Introduction of Pipe-Making Plant

    Since 2016, Ethiopia economy has been developing rapidly, the government support lots industries to establish their new workshops, so Mr Ashenafi built three new warehouses for pipe making. We Dongqi Group contacted Mr Ashenafi from the beginning of January, 2016, after learning the crane needs of pipe-making warehouse, our sales director Mr Oscar was responsible for giving below solutions:


    10 Ton Overhead Crane Drawing

    Mr Ashenafi was very satisfied with above crane solution, after a period of communication about some crane technical question, then sign the contract at the end of 2016 and totally amount is US DOLLARS 143,000.00.

    Crane Installation Engineer Reached to Ethiopia

    On 8th May, Our technical team visited our Ethiopia customer Pipe-Making Plant, for installation and commission of 6 sets 10 ton double girder overhead crane, which is shipped and arrived customer’s plant last year, on that day Mr Ashenafi arrange people to pick Mr Chen up at the airport.


    Preparation before Overhead Crane Installation

    On the second day after arrival, Mr Wei request to go to warehouse to check all the overhead crane girders, boxes, electrics boxes, beams and rails and other crane spare parts which could ensure all crane parts are ready, then Mr Chen had a meeting with Mr Ashenafi and his team, Mr Wei told them to prepare related overhead crane installation tools, such as mobile crane, welding machine, screwdriver, forklift, lever etc, and how many people it will need to ensure the overhead crane installation process operate smoo